West Park Industrial
Estate, Derrimut
WBCM Pty Ltd was engaged by Australand
(Commercial and Industrial Division) in 2004 to provide engineering
services for the development of this industrial site on an area of
84.3 ha to the north west of the Melbourne CBD. Lot sizes
range from 2,000 sq metres to 10 hectares.
This area was then extended by a further 84
hectares following further land acquisitions.
The location and topography of the site, with Laverton Creek and
Kayes Drain running through the site and major roads on three
sides, plus 1,600m of 500mm PE Water Distribtion Main for City
West Water, has posed numerous design issues and has required
ongoing liaison and negotiations with three Councils, VicRoads,
Melbourne Water, service authorities and adjacent
developers.
The
majority of construction works for this development have now been
completed, with Stage 9 internal works done and the Mt Derrimut
Road duplication works for the 1,400 metres between Boundary Road
and the Deer Park Bypass almost finalised.
WBCM is pleased to be associated with Australand
in this extensive industrial development.
|